Hyni
Polure

Montimi i Bordurave dhe Fashave të Kateve Hap pas Hapi

Udhëzues profesional hap pas hapi mbi instalimin e drejtë horizontal të bordurave të fasadës me ngjitës strukturor poliuretani.

Montimi i bordurave dhe fashave ndarëse të kateve prej poliuretani kërkon vijëzim të saktë horizontal për të garantuar linja të përsosura arkitekturore.

Hapi 1: Vijëzimi me Lazer dhe Veglat e Punës

  1. Step 1: Surface Inspection and Level MarkingMeasure and mark the horizontal height line across the wall using a digital laser level. Clean dust and grease from the substrate using a dry cloth. Duration: 15–20 minutes. Common Mistake: Relying on floor-to-wall distance instead of a laser level, resulting in slanted installation lines over uneven floors.
  2. Step 2: Measuring and 45-Degree Miter CuttingMeasure wall segments accurately and transfer dimensions to the border profile. Execute 45-degree corner joints and 30-degree bevel joints for straight length extensions using a fine-toothed miter saw. Duration: 25–30 minutes. Common Mistake: Cutting miter angles in the wrong direction for internal versus external corners.
  3. Step 3: Polyurethane Adhesive ApplicationApply continuous beads of polyurethane mounting adhesive along the rear bonding channels and joint cross-sections of the profile. Never use silicone adhesive. Duration: 10–15 minutes. Common Mistake: Applying insufficient adhesive on cut joint edges, leading to hairline cracks after thermal expansion.
  4. Step 4: Positioning and Mandatory Screw FixingPress the border molding firmly against the wall alignment line. Drive mechanical screws through pre-drilled pilot holes into wall plugs spaced every 40 to 60 cm for secure anchorage. Duration: 30–40 minutes. Common Mistake: Relying solely on adhesive without mechanical screw fixing, causing profile sagging before curing.
  5. Step 5: Joint Filling with PuttyFill screw countersinks and profile connection joints using specialized joint putty. Remove excess material immediately using a flexible spatula. Duration: 20–25 minutes. Common Mistake: Applying thick coats of putty without wiping excess material, increasing sanding labor.
  6. Step 6: Sanding and Surface LevellingAllow the putty to cure completely according to manufacturer instructions. Sand filled joints flush with the profile surface using fine granulim 180-220 sandpaper. Duration: 15–20 minutes. Common Mistake: Using coarse sandpaper below 120 grit, which gouges the rigid polyurethane body and damages factory priming.
  7. Step 7: Priming and Double-Coat Final PaintingApply an optional acrylic spot primer on filled joints if needed. Finish with two coats of water-based interior paint or UV-resistant exterior paint depending on application location. Duration: 40–60 minutes (excluding drying intervals). Common Mistake: Using standard interior paint on outdoor installations, causing premature UV discoloration.

Hapi 2: Prerja e Këndeve dhe Puthitja e Profileve

Pritni bordurat me gjatësi standarde 2400-2440 mm në kënd 45° në këndet e jashtme të ndërtesës me marzhin e llogaritur të mbetjeve 10%.

Hapi 3: Aplikimi i Ngjitësit dhe Montimi

Aplikoni ngjitësin ngjitës montimi me bazë PU në vijë valore përgjatë pjesës së pasme të profilit me densitet 150-220 kg/m³ (objektivi i prodhimit ~160 kg/m³) dhe shtypeni fort përgjatë vijës së lazerit. Koha e ngurtësimit: rreth një orë.

Hapi 4: Stukimi i Bashkimeve dhe Lyerja UV

Mbushni bashkimet me stuko elastike akrilike. Lëmoni me letër zmerile granulim 180-220 dhe aplikoni bojë fasade UV mbi astarin e fabrikës bojë bazë akrilike e bardhë njëkomponentëshe. Qëndrueshmëri në temperaturat -100 °C / +80 °C.

Pyetjet e Shpeshta

A duhet që bordura të ketë pjerrësi të sipërme për kullimin e ujit?

Po, profilet tona të fasadës kanë një pjerrësi të llogaritur të sipërme që parandalon grumbullimin e ujit të shiut.

Sa kohë duhet të thahet ngjitësi?

Ngjitësi strukturor ngjitës montimi me bazë PU arrin forcën maksimale për rreth një orë.

Sa kohë vlen oferta zyrtare?

Të gjitha ofertat zyrtare kanë vlefshmëri prej 7 ditë.

Si transportohen bordurat e fasadës?

Dërgohen franko fabrikë të tipit franko fabrikë në kuti kartoni mbrojtëse.

Produktet e Këtij Udhëzuesi

Montimi i Bordurave dhe Fashave | Polure