Hyni
Polure

Montimi i Veshjeve të Fasadës Hap pas Hapi

Udhëzues teknik profesional mbi montimin e integruar të kornizave, kurorave dhe konsolave të fasadës me ngjitës të posaçëm të jashtëm.

Montimi i elementeve dekorative të fasadës së jashtme prej poliuretani realizohet duke kombinuar ngjitësin strukturor me vida mekanike mbajtëse.

Hapi 1: Përgatitja e Suvasë dhe Veglat e Punës

  1. Step 1: Wall Preparation and MarkingInspect the wall substrate to confirm it is fully dry, level, and free of contaminants. Measure the facade alignment using a laser level, marking precise target lines for every cladding section. Estimated time: 30–45 minutes per elevation. Common mistake: Mounting over damp or crumbling plaster, which leads to total bond failure.
  2. Step 2: Profile Measurement and 45-Degree Miter CuttingMeasure profile lengths accurately, accounting for corner intersections. Cut profile edges at a precise 45-degree miter angle using a fine-tooth miter saw to ensure tight, seamless corner joints. Estimated time: 10 minutes per profile. Common mistake: Cutting with coarse hand saws, which creates jagged polyurethane edges that hinder flush seam alignment.
  3. Step 3: Polyurethane Adhesive ApplicationApply continuous beads of polyurethane-based assembly adhesive along the rear mounting channels and joint connections of the profile. Never use silicone adhesive under any circumstance. Estimated time: 5 minutes per profile. Common mistake: Applying spot-dots of adhesive instead of continuous beads, allowing water infiltration behind the cladding.
  4. Step 4: Mechanical Fixing with Screws and DowelsPress the profile firmly against the substrate and drill anchor holes through the designated recessed grooves. Secure the element mechanically using corrosion-resistant screws and masonry dowels spaced every 40-50 cm. Estimated time: 15 minutes per section. Common mistake: Relying solely on adhesive and omitting mandatory mechanical dowels.
  5. Step 5: Joint Filling and SandingFill all screw recesses and profile joints with exterior-grade joint putty. Allow full curing according to manufacturer guidelines, then sand the seams perfectly flush using granulim 180-220 sandpaper. Estimated time: 30 minutes active labour (plus drying time). Common mistake: Using coarse sandpaper under 150 grit, which scratches the factory-primed profile surface.
  6. Step 6: Primer Verification and Final UV CoatingEnsure all sanded joints are dust-free. Apply an optional exterior primer coat if recommended by the paint manufacturer, followed by 2 complete coats of UV-resistant exterior paint. Estimated time: 1-2 hours (plus drying intervals). Common mistake: Using interior-grade or non-UV paint, causing rapid discoloration and surface chalking under direct sunlight.

Hapi 2: Prerja e Këndeve dhe Puthitja e Profileve

Pritni profilet me gjatësi standarde 2400-2440 mm në kënd 45° për dritaret dhe fashat e kateve duke llogaritur marzhin e mbetjeve 10%.

Hapi 3: Aplikimi i Ngjitësit dhe Ankorimi Mekanik

Aplikoni ngjitësin ngjitës montimi me bazë PU në pjesën e pasme të profilit me densitet 150-220 kg/m³ (objektivi i prodhimit ~160 kg/m³). Për profilet e mëdha dhe konsolat përforconi lidhjen me vida mekanike me upa në mur. Koha e ngurtësimit: rreth një orë.

Hapi 4: Mbyllja e Fugave dhe Boja Mbrojtëse UV

Mbushni bashkimet me stuko elastike fasade. Lëmoni me letër zmerile granulim 180-220 dhe aplikoni dy duar bojë fasade UV mbi astarin e fabrikës bojë bazë akrilike e bardhë njëkomponentëshe. Qëndrueshmëri në -100 °C / +80 °C dhe përthithje uji nën 1%.

Pyetjet e Shpeshta

Pse kërkohet bojë fasade me mbrojtje UV pas montimit?

Boja UV mbron astarin dhe ngjyrën nga rrezet e forta diellore, duke ruajtur shkëlqimin për shumë vite.

Sa kohë duhet të thahet ngjitësi?

Ngjitësi strukturor ngjitës montimi me bazë PU arrin forcën maksimale për rreth një orë.

Sa kohë vlen oferta zyrtare?

Të gjitha ofertat zyrtare kanë vlefshmëri prej 7 ditë.

Si transportohen elementet e fasadës?

Dërgohen franko fabrikë të tipit franko fabrikë në paketim mbrojtës të sigurt.

Produktet e Këtij Udhëzuesi

Montimi i Veshjeve të Fasadës | Polure