Montimi i qemerëve dhe harqeve rrethorë prej poliuretani: Udhëzues hap pas hapi
Si të instaloni qemerë dhe harqe rrethorë: Bashkimi i segmenteve të lakuara me kornizat drejtvizore dhe mbyllja e padukshme e fugave.
Instalimi i qemerëve dhe harqeve të lakuar prej poliuretani rreth kalimeve kërkon përputhje të saktë të rrezes dhe ngjitje të sigurt kimike.

Përgatitja e sipërfaqes së harkut dhe veglat
- Step 1: Surface Inspection and Preparation — Ensure the substrate is clean, dry, level, and free of loose dust or oil. Duration: 15-30 minutes. Common mistake: Applying polyurethane adhesive over unstable plaster or damp wall surfaces, causing bond failure.
- Step 2: Arc Template and Radius Measurement — Measure the span and height of the archway, then trace a 1:1 scale template on cardboard or directly on the wall to guide segment placement. Duration: 30-45 minutes. Common mistake: Relying on estimates instead of measuring multiple arc points, leading to visible gaps between profile segments.
- Step 3: Miter Cutting and Segment Dry-Fitting — Cut the polyurethane arch profiles at precise 45-degree miter angles using a fine-toothed saw, then dry-fit all segments against the marked template. Duration: 30-60 minutes. Common mistake: Cutting without verifying the correct angle orientation for curved profile geometry.
- Step 4: Adhesive Application and Profile Placement — Apply continuous beads of polyurethane (PU) assembly adhesive along profile contact surfaces and joint faces; do not use silicone. Press segments firmly onto the wall substrate. Duration: 20-40 minutes. Common mistake: Using silicone sealants, which leads to joint separation and failure.
- Step 5: Mechanical Anchoring with Screws — Drill pilot holes through the polyurethane profile into the wall substrate and drive screws into wall plugs every 300-400 mm along the arc. Duration: 30-45 minutes. Common mistake: Omitting mechanical fasteners and relying solely on adhesive bonding.
- Step 6: Joint Puttying and Sanding — Fill screw countersinks and profile joints with specialized putty. Allow it to dry completely, then sand smooth using granulim 180-220 sandpaper. Duration: 45-60 minutes (excluding drying time). Common mistake: Using coarse sandpaper that gouges the factory-primed polyurethane surface.
- Step 7: Primer Touch-Up and Final Painting — Apply an optional touch-up primer over sanded joints, followed by two coats of UV-resistant paint for exterior projects or quality interior paint. Duration: 1-2 hours. Common mistake: Applying non-UV resistant paint outdoors, resulting in discoloration and weathering.
Hapi 1: Matja e rrezes dhe kontrolli i harkut (Kohëzgjatja: 15 min.)
Përcaktoni rrezen e brendshme të derës dhe shënoni qendrën e harkut. Dendësia masive prej 150-220 kg/m³ (objektivi i prodhimit ~160 kg/m³) siguron që segmentet e lakuara të mos deformohen gjatë shtypjes në mur.
Hapi 2: Prerja e kornizave vertikale anësore (Kohëzgjatja: 25 min.)
Pritini kornizat anësore në shufra prej 2400-2440 mm drejt në pikën e takimit me fillimin e harkut, duke parashikuar një mbetje prerjeje prej 10%.
Hapi 3: Ngjitja e gjysmëharqeve dhe gurit qendror (Kohëzgjatja: 30 min.)
Aplikoni ngjitës PU ngjitës montimi me bazë PU në shpinën e harqeve dhe në faqet e bashkimit, duke vendosur gurin e kyçit në kulm dhe duke i mbajtur të shtypura deri në ngjitje (rreth një orë).
Hapi 4: Mbushja e fugave, lëmimi dhe lyerja (Kohëzgjatja: 20 min.)
Mbushni bashkimet me fino, lëmoni me letër zmerile granulim 180-220 dhe lyeni mbi astarin e bardhë bojë bazë akrilike e bardhë njëkomponentëshe. 0% thithje uji nën 1% në diapazonin -100 °C / +80 °C. Oferta e vlefshme 7 ditë, dorëzimi franko fabrikë.