Montaje de Alféizares y Vierteaguas Paso a Paso
Manual profesional sobre la inclinación hacia el exterior (2 a 3 grados), desvío de aguas pluviales y estanqueidad bajo la carpintería.
La correcta instalación de los alféizares y vierteaguas de poliuretano expulsa el agua de lluvia lejos del paramento, evitando manchas y humedades en la fachada.

Paso 1: Preparación de la Base y Comprobación de Pendiente
- Step 1: Substrate Inspection and Surface Preparation — Clean the installation area thoroughly using a dry wire brush and dust blower to remove loose debris, mortar flashes, or grease. Ensure the mounting substrate is completely dry and structurally sound. Estimated Time: 15 minutes. Common Error: Applying adhesive over wet or dusty rendering, which causes bond failure.
- Step 2: Measurement and 45-Degree Miter Cutting — Measure the window opening width precisely, adding required end-cap overhangs. Cut the polyurethane profile ends at a clean 45-degree miter angle using a fine-toothed miter saw. Estimated Time: 20 minutes. Common Error: Cutting at high blade speeds that melt the polyurethane edge rather than shearing it cleanly.
- Step 3: Polyurethane Adhesive Application — Apply continuous 8 mm beads of polyurethane (PU) assembly adhesive along the back contact surface and joint faces. Do not use silicone sealants under any circumstances. Estimated Time: 10 minutes. Common Error: Using standard silicone or applying spot dabs instead of continuous adhesive beads.
- Step 4: Profile Positioning and Mechanical Fastening — Press the sill profile firmly onto the substrate, verifying a forward drainage slope of at least 5 degrees with a spirit level. Drive stainless steel screws with wall plugs through countersunk holes spaced 40-50 cm apart. Estimated Time: 25 minutes. Common Error: Omitting mechanical screws and relying solely on adhesive.
- Step 5: Joint Filling and grano 180-220 Sanding — Fill countersunk screw heads and 45-degree joint seams with flexible polyurethane putty. Allow the putty to cure completely, then sand flush using grano 180-220 sandpaper. Estimated Time: 30 minutes (excluding curing time). Common Error: Sanding before the joint putty has fully cured, causing indentation marks.
- Step 6: Spot Priming and UV Topcoat Painting — Apply an acrylic primer over sanded joint areas if raw polyurethane is exposed. Finish the complete sill with two coats of high-grade UV-resistant exterior paint. Estimated Time: 40 minutes (plus dry times). Common Error: Using interior paint or skipping UV-resistant coatings on exterior surfaces.
Paso 2: Corte a Medida con Sobrepaso Lateral (10 cm)
Corte el alféizar de longitud estándar 2400-2440 mm con serrucho de diente fino, dejando 10 cm de vuelo a cada lado respecto al hueco para asentar las jambas verticales aplicando el margen 10%.
Paso 3: Aplicación del Adhesivo y Fijación Mecánica
Aplique cordones de adhesivo de poliuretano adhesivo de montaje a base de PU en la base con densidad 150-220 kg/m³ (objetivo de producción ~160 kg/m³) y fije con tornillos avellanados en la parte posterior oculta. Tiempo de curado: aproximadamente una hora.
Paso 4: Sellado Elástico de Encuentros y Pintura UV
Selle la junta de encuentro con el marco de la ventana con masilla elástica exterior, lije suavemente grano 180-220 y pinte con pintura con filtro UV sobre la imprimación imprimación acrílica blanca monocomponente en temperaturas -100 °C / +80 °C. Inmune al agua (inferior al 1%).
Preguntas Frecuentes