Pose d'arches et moulures cintrées en polyuréthane: Guide pas à pas
Comment installer des arcs cintrés au-dessus des portes: Raccordement des voussoirs avec les chambranles verticaux et masquage des joints.
L'installation d'arches et de moulures cintrées en polyuréthane au-dessus des passages et fenêtres apporte un raffinement classique remarquable.

Vérification du rayon de courbure et matériel requis
- Step 1: Surface Inspection and Preparation — Ensure the substrate is clean, dry, level, and free of loose dust or oil. Duration: 15-30 minutes. Common mistake: Applying polyurethane adhesive over unstable plaster or damp wall surfaces, causing bond failure.
- Step 2: Arc Template and Radius Measurement — Measure the span and height of the archway, then trace a 1:1 scale template on cardboard or directly on the wall to guide segment placement. Duration: 30-45 minutes. Common mistake: Relying on estimates instead of measuring multiple arc points, leading to visible gaps between profile segments.
- Step 3: Miter Cutting and Segment Dry-Fitting — Cut the polyurethane arch profiles at precise 45-degree miter angles using a fine-toothed saw, then dry-fit all segments against the marked template. Duration: 30-60 minutes. Common mistake: Cutting without verifying the correct angle orientation for curved profile geometry.
- Step 4: Adhesive Application and Profile Placement — Apply continuous beads of polyurethane (PU) assembly adhesive along profile contact surfaces and joint faces; do not use silicone. Press segments firmly onto the wall substrate. Duration: 20-40 minutes. Common mistake: Using silicone sealants, which leads to joint separation and failure.
- Step 5: Mechanical Anchoring with Screws — Drill pilot holes through the polyurethane profile into the wall substrate and drive screws into wall plugs every 300-400 mm along the arc. Duration: 30-45 minutes. Common mistake: Omitting mechanical fasteners and relying solely on adhesive bonding.
- Step 6: Joint Puttying and Sanding — Fill screw countersinks and profile joints with specialized putty. Allow it to dry completely, then sand smooth using grain 180-220 sandpaper. Duration: 45-60 minutes (excluding drying time). Common mistake: Using coarse sandpaper that gouges the factory-primed polyurethane surface.
- Step 7: Primer Touch-Up and Final Painting — Apply an optional touch-up primer over sanded joints, followed by two coats of UV-resistant paint for exterior projects or quality interior paint. Duration: 1-2 hours. Common mistake: Applying non-UV resistant paint outdoors, resulting in discoloration and weathering.
Étape 1: Mesure du rayon et traçage du centre (Durée: 15 min)
Relever le rayon intérieur de la baie cintrée. La densité compacte de 150-220 kg/m³ (cible de production ~160 kg/m³) assure un cintrage parfait des éléments sans gauchissement lors de l'application au mur.
Étape 2: Découpe d'aboutement des chambranles verticaux (Durée: 25 min)
Couper droit les moulures verticales en barres de 2400-2440 mm à la ligne de naissance de l'arc, en tenant compte d'une marge de coupe de 10%.
Étape 3: Collage des demi-arches et de la clé de voûte (Durée: 30 min)
Encoller généreusement le dos des segments courbes avec la colle PU colle de montage à base de PU, positionner la clé de voûte au sommet et maintenir fermement jusqu'à la prise (environ une heure).
Étape 4: Lissage des raccords, ponçage et peinture (Durée: 20 min)
Enduire les joints de raccord, poncer doucement avec grain 180-220 et appliquer la peinture sur la sous-couche primaire acrylique blanc monocomposant. 0% absorption d'eau inférieure à 1 % dans la plage -100 °C / +80 °C. Offre valable 7 jours, livraison départ usine.
Questions Fréquentes

















