Connexion
Polure
Favoris

Mains Courantes d'Escalier : Pose Rampante et Découpes

Manuel technique pour ajuster la rampe sur la ligne de foulée, raccorder les départs d'escalier aux paliers et assurer une ergonomie parfaite.

La pose d'une main courante rampante en polyuréthane habille l'escalier d'une prise en main confortable en suivant la ligne de pente exacte des marches.

Avertissement Critique de Sécurité : Habillage Non Porteur

  1. Substructure Core VerificationVerify that the load-bearing steel or concrete core framework is securely anchored to the staircase structure and compliant with local structural safety codes.
  2. Angle Measurement and CuttingMeasure the exact incline angle of the staircase. Execute precision 45-degree miter cuts or custom compound cuts on the polyurethane handrail sections using a fine-toothed miter saw.
  3. Adhesive ApplicationApply a continuous bead of specialized polyurethane assembly adhesive along the contact surfaces and miter joints. Standard silicone adhesives are strictly prohibited due to inadequate structural bonding capability.
  4. Mechanical FasteningPosition the handrail over the core structure and execute mandatory mechanical screw fixing to secure the polyurethane profile firmly into place while the adhesive cures.
  5. Joint Filling and Surface SandingFill all fastener countersinks and miter joint seams with polyurethane-compatible surface filler. Once cured, sand the joints smooth using grain 180-220 sandpaper.
  6. Surface Priming and UV TopcoatingClean all dust from the surface. While factory-primed profiles accept direct painting, applying an optional additional primer coat ensures optimal adhesion for the mandatory two topcoats of UV-resistant exterior paint.

Étape 1 : Relevé de l'Angle de Pente à la Fausse Équerre

Mesurez l'angle d'inclinaison des marches et reportez-le sur la boîte à onglets en barres de longueur standard 2400-2440 mm avec densité de 150-220 kg/m³ (cible de production ~160 kg/m³).

Étape 2 : Découpe Biseautée des Raccords de Palier

Réalisez les coupes d'onglet reliant la section rampante à la section horizontale de palier en appliquant une marge de coupe de 10%.

Étape 3 : Double Encollage et Fixation Mécanique

Appliquez la colle structurelle colle de montage à base de PU (séchage en environ une heure) sur le fer plat de l'armature et vissez par le dessous.

Étape 4 : Masticage, Ponçage et Peinture Laquée

Comblez les jonctions au mastic souple, poncez au grain fin grain 180-220 et peignez sur l'apprêt primaire acrylique blanc monocomposant sous -100 °C / +80 °C. Imperméable (inférieure à 1 %). Devis valables 7 jours, livraison départ usine départ usine.

Questions Fréquentes

Precision execution on non-standard staircase geometries requires professional field measurements. On-site technical survey, measurement, analysis, and 3D spatial scanning services are carried out as fee-based professional operations. Technical teams utilize XGRID point cloud technology and precision Artec 3D scanners (including Ray, Spider 2, Eva, and Leo models) to capture exact spatial dimensions.

When necessary, the complete staircase volume is scanned into digital point clouds. These precise 3D scanned models are then integrated into site renderings and production plans to guarantee exact fitment before field cutting. Project cost estimations and formal price quotes are provided without charge, whereas on-site survey fees are calculated based on location and scope.

Logistics and Multi-Country Surface Protection

International logistics across European borders require protective packaging to prevent profile abrasion during transit. Upon arrival at the installation site, polyurethane profiles must be stored on flat, dry surfaces away from direct soil contact. When installed on exterior staircases, applying a UV-resistant topcoat paint is mandatory to prevent long-term surface degradation from direct sun exposure.

Frequently Asked Questions

Quelle est la durée de validité de votre offre de prix formelle ?

Tous les devis officiels émis par Polure bénéficient d'une validité garantie de 7 jours.

Comment sont expédiées les mains courantes d'escalier ?

Elles sont expédiées en conditions départ usine départ usine dans des cartons renforcés.

Is an additional primer layer required before final painting?

Polyurethane profiles arrive factory-primed, making extra primer optional. However, applying two coats of UV-resistant paint is mandatory, especially for exterior applications.

How are technical site surveys and 3D measurements conducted?

On-site technical surveys using XGRID point cloud and Artec 3D scanners are paid services determined by location and project scope. Preparing project price quotes is completely free of charge.

What are the physical density and temperature limits of these profiles?

Polure rigid polyurethane profiles feature a density of 150-220 kg/m³ (cible de production ~160 kg/m³), water absorption inférieure à 1 %, and a service temperature tolerance ranging from -100 °C / +80 °C.

Bu Rehberdeki Ürünler

Pose de Main Courante d'Escalier | Polure