Montaža Lukova i Zakrivljenih Okvira

Detaljan korak-po-korak vodič za spajanje polukružnih lučnih segmenata sa ravnim fasadnim šovnama i lepljenje bez zazora.

Montaža poliuretanskih polukružnih lučnih okvira omogućava brzo i savršeno uokvirivanje zakrivljenih otvora uz upotrebu fabričkih segmenata i strukturnog lepka.

Potreban Alat za Montažu

  1. Step 1: Surface Inspection and Preparation — Ensure the substrate is clean, dry, level, and free of loose dust or oil. Duration: 15-30 minutes. Common mistake: Applying polyurethane adhesive over unstable plaster or damp wall surfaces, causing bond failure.
  2. Step 2: Arc Template and Radius Measurement — Measure the span and height of the archway, then trace a 1:1 scale template on cardboard or directly on the wall to guide segment placement. Duration: 30-45 minutes. Common mistake: Relying on estimates instead of measuring multiple arc points, leading to visible gaps between profile segments.
  3. Step 3: Miter Cutting and Segment Dry-Fitting — Cut the polyurethane arch profiles at precise 45-degree miter angles using a fine-toothed saw, then dry-fit all segments against the marked template. Duration: 30-60 minutes. Common mistake: Cutting without verifying the correct angle orientation for curved profile geometry.
  4. Step 4: Adhesive Application and Profile Placement — Apply continuous beads of polyurethane (PU) assembly adhesive along profile contact surfaces and joint faces; do not use silicone. Press segments firmly onto the wall substrate. Duration: 20-40 minutes. Common mistake: Using silicone sealants, which leads to joint separation and failure.
  5. Step 5: Mechanical Anchoring with Screws — Drill pilot holes through the polyurethane profile into the wall substrate and drive screws into wall plugs every 300-400 mm along the arc. Duration: 30-45 minutes. Common mistake: Omitting mechanical fasteners and relying solely on adhesive bonding.
  6. Step 6: Joint Puttying and Sanding — Fill screw countersinks and profile joints with specialized putty. Allow it to dry completely, then sand smooth using granulacija 180-220 sandpaper. Duration: 45-60 minutes (excluding drying time). Common mistake: Using coarse sandpaper that gouges the factory-primed polyurethane surface.
  7. Step 7: Primer Touch-Up and Final Painting — Apply an optional touch-up primer over sanded joints, followed by two coats of UV-resistant paint for exterior projects or quality interior paint. Duration: 1-2 hours. Common mistake: Applying non-UV resistant paint outdoors, resulting in discoloration and weathering.

Korak 1: Priprema Zida i Provera Radijusa

Lučni deo fasadne špaletne se otpraši. Lučni segmenti se prislanjaju na suvo radi provere savršenog poklapanja radijusa sa otvorom.

Korak 2: Lepljenje Lučnih Segmenata

Lepak montažno lepilo na bazi PU se nanosi na poleđinu luka u neprekidnoj liniji i segmenti se pritisnu na fasadni zid. Vreme sušenja iznosi oko jedan sat.

Korak 3: Spoj sa Vertikalnim Lajsnama i Ključnim Kamenom

Ravne lajsne standardne dužine 2400-2440 mm seku se pod 90° i spajaju na donjim krajevima luka. Na temenu luka postavlja se ključni kamen.

Korak 4: Kitovanje, Šmirglanje i Završno Bojenje

Svi spojevi se popunjavaju elastičnim kitom i šmirglaju sa granulacija 180-220. Nanosi se fasadna akrilna boja preko fabričkog prajmera beli jednokomponentni akrilni prajmer.

Често Постављана Питања

Koliko vremena traje montaža jednog lučnog okvira?

Kompletno pozicioniranje i lepljenje lučnog okvira sa vertikalama traje oko 45 do 60 minuta.

Da li se lučni profil može lako prefarbati?

Da, isporučuje se sa belim fabričkim prajmerom beli jednokomponentni akrilni prajmer spremnim za fasadne boje.

Koliko vremena se lepak mora sušiti?

Poliuretanski lepak montažno lepilo na bazi PU zahteva vreme sušenja od oko jedan sat.

Kako se transportuju lučni okviri?

Šalju se franko fabrika tipa franko fabrika u zaštitnoj kartonskoj ambalaži.