Come montare travi squadrate effetto tronco : Guida alla posa
Soffitti rustici da rifugio alpino : Come montare travi squadrate a sezione cava su soffitti in legno o cartongesso con blocchetti a scomparsa.
Il montaggio delle travi squadrate in finto tronco in poliuretano trasforma solai e mansarde con l'aspetto solenne dei tronchi intagliati a mano.

Avvertenza Strutturale : Travi Non Portanti
- Step 1: Surface Inspection and Layout Marking — Inspect the mounting substrate to verify it is completely clean, dry, and free of dust or loose plaster. Mark the layout lines on the ceiling or wall based on the log diameter and desired axial spacing. Duration: 30 minutes. Common Mistake: Installing profiles over damp or dusty substrates, which impairs adhesive bonding.
- Step 2: Precision Measuring and 45-Degree Miter Cutting — Measure the required span lengths and cut the polyurethane logs using a high-precision miter saw. Ensure all corner connections and joint transitions utilize accurate 45-degree miter cuts. Duration: 20 minutes per log section. Common Mistake: Making straight cuts without checking corner angles, leaving visible gaps at wall junctions.
- Step 3: Applying Polyurethane Assembly Adhesive — Apply continuous beads of polyurethane assembly adhesive along the contact edges and inner bonding channel of the log profile. Never substitute this material with standard silicone sealant. Duration: 10 minutes per log. Common Mistake: Using silicone adhesives that fail to form a rigid structural bond with polyurethane.
- Step 4: Overhead Positioning and Mandatory Mechanical Anchoring — Press the log firmly onto the marked ceiling layout lines. Immediately secure the profile mechanically by driving screws through pre-drilled holes into wall plugs set within the ceiling substrate. Duration: 15 minutes per anchoring point. Common Mistake: Relying solely on adhesive and omitting mandatory mechanical wall plugs and screws.
- Step 5: Joint Filling and Surface Sanding — Fill all screw head recesses and section joints with polyurethane-compatible putty. Once cured, sand the treated areas smooth using grana 180-220 sandpaper to create a continuous surface profile. Duration: 25 minutes per joint. Common Mistake: Using coarse sandpaper below 180 grit, which scratches the factory surface texture.
- Step 6: Final Priming and Protective Coating — Inspect the factory-primed surface and apply an optional additional acrylic primer if localized filling occurred. Finish the log with two coats of paint, ensuring the paint specified for outdoor installations is fully UV-resistant. Duration: 45 minutes plus drying time. Common Mistake: Using non-UV resistant interior paint for exterior log installations.
Fase 1 : Tracciamento su Soffitti Piani o Inclinati (Tempo : 20 min)
Tracciate gli assi longitudinali e fissate blocchetti in legno ogni metro calcolando la stabilità dimensionale a -100 °C / +80 °C.
Fase 2 : Taglio Travi e Incollaggio PUR a Incastro (Tempo : 30 min)
Tagliate le aste da 3000 mm calcolando lo sfrido 10%, stendete colla adesivo di montaggio a base PU (indurimento in circa un’ora) e incastrate in densità 150-220 kg/m³ (obiettivo di produzione ~160 kg/m³).
Fase 3 : Posa Testate Sagomate e Finitura (Tempo : 25 min)
Applicate le testate di chiusura sui terminali a vista con patine noce su primer primer acrilico bianco monocomponente. idrorepellente (inferiore all’1%). Offerte 7 giorni, consegna franco fabbrica.
Domande Frequenti

















